Bathroom Remodeling
Six months in the making. This is one of three bathrooms remodeled. The first two was done in 2007-2008. This one has a lot to do. Started in April of 2009. Everything original goes back 30 years before has been removed and disposed. I started with the floor. Laying down cement board, secured to the wood floor board, and the marble tile next. The next is the walls. The tub/shower sheetrock was ripped out and replaced with the cement board. The wall tiling took months to complete. Plumbing was done. Install of toilet, vanity, sink, resurface the walls for painting and ceiling painting, install medicine cabinet, install new light fixtures. And the finishing touches with framed animes of UFO Princess Valkyrie and Moetan. I love my new bath. It’s like never before seen. Many of my relatives love it too. All this done by one guy. Yours truly. Audio soundtracks of two from CD “UfO Princess Walkure (Valkyrie) Original Soundtracks and Love” (out of print). 2002 NIPPON COLUMBIA. Japan import.