uprightinside.com This is a loft addition compressed into 3 and 1 minutes. If you have a high ceiling call Upright and they can build it within 10-15 business days (3 weeks). This is the most affordable type of room addition. This particular addition also had two skylights installed. This is why you see the removal of the existing ceiling (for reframing).